FINANCIAL CONTROL OVER STORES FINANCES
ORGANIZATION OF STORES BRANCH
COS
CMM
DY CMM/ Sr DMM
SMM/DMM
AMM
Ch OS DMS/DSK
OSI/ OSII WARD KEEPER
HC STORE KHALASI
SC/CL
Stores Depots:
In Southern Railways , there are 5 Divisional stores set-ups and 23 stores depots (including 3 divisional stores depots) spread all over the states of Tamil Nadu and Kerala. The stores depots have been listed below with the place code and its location……
The stores department of Southern Railway supplies nearly 14000 items of raw materials, spare parts and consumables required for the maintenance of Railway assets and operation of services through its 23 stores depots located at various locations in Southern Railway. For enabling systematic management of the purchase and warehousing functions all these items are categorized into 79 major groups with each item being given a unified 8 digit price ledger number, all over the Indian Railways.
Characters of 8 digits:
1, 2 digits Major groups; 3, 4 digits Sub groups; 6, 7 digits Serial No
8 digits Check digit
DETAILS OF STORES DEPOTS ON SOUTHERN RAILWAY
S.No
|
Place code
|
Office Name
|
Place/Station
|
1
|
00
|
General Stores Depot
|
Perambur
|
2
|
01
|
Loco Stores Depot
|
Perambur
|
3
|
02
|
Mechanical Stores Depot
|
Golden Rock,Trichy
|
4
|
07
|
General Stores Depot
|
Palghat
|
5
|
08
|
Diesel Stores Depot
|
Erode
|
6
|
09
|
Branch Stores Depot(Eng)
|
Arakkonam
|
7
|
10
|
Traction Stores Depot
|
Tambaram
|
8
|
11
|
Signal Stores Depot
|
Podanur
|
9
|
12
|
Press Stores Depot(Rly printing press)
|
Royapuram/Chennai
|
10
|
13
|
General Stores Depot
|
Erode
|
11
|
14
|
Divisional Stores Depot
| |
12
|
17
|
Wagon Production
|
Golden Rock,Trichy
|
13
|
18
|
Diesel Stores Depot(Diesel work shop)
|
Golden Rock,Trichy
|
14
|
19
|
Diesel Stores Depot(Diesel shed)
|
Golden Rock,Trichy
|
15
|
20
|
General Stores Depot
|
Quilon
|
16
|
21
|
Electric Loco Stores Depot
|
Arakkonam
|
17
|
22
|
Electric Loco Stores Depot
|
Erode
|
18
|
23
|
Diesel Stores Depot
|
Ernakulam
|
19
|
24
|
General Stores Depot
|
Golden Rock,Trichy
|
20
|
25
|
Coach Maintenance Stores Depot
|
Basin Bridge/Chennai
|
21
|
26
|
Diesel Stores Depot
|
Tondiarpet/Chennai
|
22
|
27
|
Traction Stores Depot
|
Avadi
|
23
|
28
|
Carriage Stores Depot
|
Perambur
|
Purchase Section
|
Group Of Stores
|
Description Of Stores
|
04
|
30,32,33,34,36
|
Carriage and wagon spares
|
44
|
37,38,39
|
Carriage and wagon spares
|
WP
|
37,38,71,73
|
Wagon production
|
21
|
00 to 09
|
Steam loco spares
|
31,35
|
E.M.U. coaches, B.G and M.G. spares
| |
13
|
10,15
|
Diesel loco spares
|
28
|
12
|
Diesel loco spares
|
43
|
11
|
Diesel loco spares
|
29
|
13,14
|
Diesel loco spares
|
01
|
74,84
|
Wire ropes, chains, oil lamps, buckets, refractory, asbestos and class sheets
|
60,85
|
Track maintenance tools, ball and roller bearings
| |
06
|
82,83
|
Hospital equipments and stationary
|
09
|
75,91
|
Rubber, plastic, canvas and leather goods non-ferrous metals
|
27
|
79
|
Cloth, personal equipments, cotton and woolen products
|
40
|
77,81
|
Paints, enamels acids, chemicals
|
10
|
80,86,92
|
Petroleum products, fire fighting equipments, coal, coke fuel oil
|
93
|
Timber
| |
11
|
42
|
General electrical fittings
|
45
|
Train lighting cells, train lighting items
| |
12
|
40
|
Cables, conductors and wires
|
41,43
|
Insulators and insulating materials, electrical measuring instruments
| |
46,47
|
Electrical sub-station transmission and distribution equipments, electrical machinery and parts
| |
26
|
25,28
|
A.C.loco spares
|
05
|
50
|
Telegraph and telephone equipments and spares
|
52,54,55
|
Wireless and electronic equipments, mechanical signal and inter-locking equipment, single and double wire
| |
07
|
70,78
|
Abrasives, furniture, kitchenware
|
71,72
|
Brushes, bamboo products, small tools
| |
73
|
Hardware fasteners, rivets, bolts
| |
14
|
90
|
Metals, ferrous and Ferro alloys including wires
|
16
|
65
|
Plants and machinery including cranes
|
66,76
|
Spares for plant and machinery, electrodes, cutting and welding accessories
| |
67
|
Road motors, auto-trucks, material handling equipments and spares
| |
35
|
56,61,62
|
Electrical signal equipments, building material pipes and pipe fittings
|
STORES ACCOUNTS
DY FA&CAO/Stores
Sr AFA/Sales, Sr AFA/GSD, Sr AFA/IC
FINANCIAL CONTROL OVER STORES EXPENDITURE – STORES FINANCE SECTION
I. TENDER OPENING
Representatives from Stores Finance – generally Section Officers are to witness the opening of bulletin tenders daily. Besides witnessing the opening of the tender boxes by the staff of stores branch, they must certify the offers group wise by rounding of the commercial terms like rate in figures and words, freight, FOR/FOB, payment clauses, any correction/overwriting/modification is duly authenticated by certified signatory.
II. QUANTITY VETTING
Vetting of Indents/ANEs:
Stock Item:
1. A-Category: vetted by Associate finance. Quantity tendered to be verified with respect to expected annual consumption (EAC) approved by COS/CMM. Buffer is taken for 1 month and for Safety/Vital items it is 2 months. If EAC being adopted is more than 10% of the last three year’s annual consumption, then it is to be indicated in the observation while verifying the tabulation statement.
2. B-Category: Vetting not required. Buffer is taken for 2 months and for Safety item it is 3 months.
3. C-Category: Quantity tendered to be verified with respect to EAC approved by competent authority.
Vetting of Non-Stock Items Indents
1. In terms of Railway Board Lr No 2007/RS(G)/779/1 dt 16-10-08, vetting of NS demand requisition is required only for Safety items above 2 lakhs and 1 lakh for other than Safety item.
2. Essentiality certificate for requisition of Safety item valuing upto 2 lakhs by Field officer at JAG level and above 2 lakhs for SAG level i.e. CWM/ADRM/DRM is needed.
3. Similarly, essentiality certificate for requisition of items other than Safety items valuing upto 1 lakhs by Field officer at JAG level and above 1 lakhs for SAG level i.e. CWM/ADRM/DRM is needed.
4. Signing of PAC: Indenting Officer – upto 25,000
i. JAG/SG officer – 75,000
ii. SAG officer – upto 3 lakhs
iii. PHOD/CHOD – above 3 lakhs
5. In case of items required for RSP, NS Indent has to be prepared invariably even if it is a stock item.
III. TABULATION OF TENDER
As per the MMIS (material management information system) programme, the vetting of Tabulation Statement will be as under
• If there are no special conditions/PVC(price variation clause) etc., given by any tenderers on commercial rate page, the IREPS (Indian Railway Electronic Procurement System) generated tabulation statement duly signed by the tender opening official from Stores and Stores Accounts shall be deemed as vetted tabulation statement and no further vetting by Stores Finance is required.
• However, any Brief Note containing details of last purchase rate - LPR, availability of Option clause, demand reference etc. should be got vetted from Finance before opening of tenderers.
• In case any updated manual tabulation statement is required to be prepared for taking PVC/conditional offer rate by tenderers with Account, such manual tabulation statement shall be vetted by Accounts as per existing procedure.
Check Points for verification of Brief Note:
• Approval of competent authority has been taken for floating a tender. This should be verified with respect to SOP.
• Description, drawing No., specification No. indicated in the demand to be verified with that tendered
• Vetted original Indent is placed on file and funds duly certified (more than 1 lakh).
• Original Indent is placed on file and with funds duly certified (less than 1 lakh).
• Newspaper clipping is available of file. The description of the item therein should match with that tendered/indented.
• In case of amendment to the tender, copy of Corrigendum is available on file.
• In case of Limited/Special Limited tender attention of all approved sources has been drawn.
• Special conditions enclosed to the AT form to be highlighted while verifying the tabulation statement.
• Tender documents not signed by the tenderers and teem with financial implications not rounded off by the tender opening officials should be brought out in the observations while verifying the tabulation statement.
• Counter offer with regard to the tendered description quoted by tenderers, if any, should be specified.
• Details of LPR/rate from neighboring Railways have been incorporated in the tabulation statement duly placing copies of the same in the case file.
• Tenderers who quote FOR/Destination to be highlighted while verifying the tabulation statement. Split up of costs to be called for purposes of bill passing.
• Special conditions such as SVC/PVC/FM/LD/ MODVAT/Discount clause have been highlighted.
• Level of TC to be indicated as per SOP.
• Briefing Note to accompany Tabulation Statement for Sr.Scale TCs onwards. COS office Lr.No.S.232.P.2G &P dt.20-06-06 to be followed.
• All sheets of the Tabulations Statement have to be signed after verification.
IV. VETTING OF DRAFT PURCHASE ORDERS
Two types of POs are vetted by Stores Finance.
- More than 10 lakhs: Purchase involving more than 10 lakhs are finalized through a constitution of Tender Committee.
POs are made out with reference to TC recommendations and acceptance.
- Less than 10 lakhs: Purchase involving less than 10 lakhs are directly finalized without going through the procedure of Tender Committee.
- The above powers are applicable only for Stores Branch and Stores Items of Civil Engineering Branch.
- Medical Branch has separate powers of delegation.
The following points are to be scrutinized while vetting a PO.
• PO has been prepared as per TC recommendations and as per the orders of the accepting authority.
• It should be ensured that there are no contradictions between the PO and the Company ’s offer and subsequent letters withdrawing/modifying certain clauses/conditions based on the Railway’s request.
• PO terms and conditions viz., destination i.e. FOB, FOR destination etc., inspection agency i.e. RDSO, RITES/Consignee, period of delivery, IRS conditions of contract, price, PVC formula should be specified, applicable rate of ED and CST, freight cost, SVC, MODVAT, payment terms, mode of despatch, EMD/SD, Guarantee terms, validity of offer etc.
• Counter offer acceptance has been received from the Company s. POs should not be placed unless the counter offer has been accepted by the Company unconditionally.
• As per the Indian Contract Act, an offer when accepted becomes a promise/contract. Therefore, in order to convert a proposal into a contract, the acceptance should be absolute and unqualified.
• An acceptance introducing new terms or conditions varying from that of a proposal amounts to a counter proposal and rejection of the original offer unless the party making the proposal renews it or agrees to suggested modification.
• In case of Stock items, availability of funds is to be ensured.
• If the value of the Non-stock PO is more than that of the Indent on account of rate, revetting of Indent is not required only additional funds have to be certified by the consignee. However, if the increase is on account of quantity, then, revetting is required.
• Developmental/Trial order should be boldly indicated on the PO.
• If Option clause is available or not should also be indicated.
• Risk purchase and details of original POs should be clearly mentioned in the Risk purchase tender POs.
• In case a Company does not accept certain conditions of advance acceptance letter, POs should not be vetted and referred back to the TC.
Vetting of POs valuing less than Rs.10 lakhs
These comprise of POs where there are no TC for these cases and are prepared with reference to the Company ’s offer.
• The role of Accounts officer in vetting in such POs acquires greater significance because these are the cases which are accepted directly by the Purchase officer and they have not been deliberated upon by a TC.
• The following points are to be scrutinized.
• Description/specification furnished are complete
• Corrections made in the demand have been attested
• Demand is vetted if the value exceeds Rs.2 lakhs in case of Safety item and Rs.1 lakh in case of other than Safety items.
• Quantity has been reviewed
• Acknowledgements for limited Tender/Bulletin Tender have been placed on the file
• List of quality spares/RDSO sources/ICF sources have been placed on the file
• Status of offer (solicited/unsolicited) with respect to registration for the subject rate growth.
• Rate reasonableness
• Reasons for passing over and acceptance of offers have been recorded on each offer as well on noting side
• Samples have been submitted if required
• Technical suitability has been obtained
• PVC has been updated
• Funds certification incase of Non-stock item has to be certified by the consignee.
• In case of Single offer for a Limited/Bulletin tender, Urgency certificate has to be given by a officer not less than the grade of SAG for above Rs.50,000 and by JAG for below Rs.50,000.
• Apart from the above, rate reasonableness should be certified and the enquiries should have been sent to all the earlier suppliers and acknowledgements to be placed on the file.
• If the value of Non-stock PO is more than that of the Indent on account of rate, additional funds have to be certified. However, if the increase is on account of quantity the Indent has to be revetted by Associate finance.
• NS requisition is to be countersigned by competent authority.
• Freight breakup given in case of FOR destination, inspecting agency indicated, payment terms, price preference/time preference, Standard Variation clause, SD, EMD, collection/waiver etc.
V. FINANCE CONCURRENCE OF MISC PROPOSALS
Stores Finance section vets modifications to purchase orders MPOs in all cases where financial implications are involved. The following situation could arise during the currency of contract and which will lead to modification of POs.
• Extension of delivery period and the funds have to be booked to a different financial year as compared to the original booking.
Check points in the MPO while exercising 30% Option clause:
• Contract is live i.e. delivery exists or supply are yet to be completed.
• 30% Option clause is available on the original PO
• Demand is available and is placed on the fie.
• Approval of competent authority has been obtained for exercising the Option clause.
• Whether any tender for similar item has been finalized subsequently at a lower rate